Drago red latin training skirt with ruffles
Products of the DRAGO brand are made after the order is placed. The production time is 2 working days for orders placed before 11:00, or 3 working days — after 11:00.
Quantity:
Total:
Total products:
Total shipping: To be determined
Tax: 0 ₴
Total:
Quantity:
Total:
Total products:
Total shipping: To be determined
Tax: 0 ₴
Total:
Reference :
Manufacturer: FD Company
FD Company products are usually available in stock. If a particular item is temporarily out of stock, the production time is 3–5 business days, depending on the current production workload.
Warning: Last items in stock!
Availability date:
Women's jumpsuit made from butter knit jersey, with side inserts at hip level backed with beige jersey and stretch mesh fabric. The neckline is finished with a sewn-on facing with 3 cm wide elastic, one-shoulder design, with flounces on the front and back; the hem is finished with 3 cm wide rigilene.
| Sleeve | Sleeveless |
| Back | Closed back |
| Decoration / Trim | Ruffled, With mesh |
| Silhouette / Bottom Cut | Wide leg |
The parameters listed in the table are average values. Minor deviations are possible depending on individual body features and the characteristics of a specific model. For the most accurate size selection, we recommend taking your own measurements and comparing them with the table data.
| Size | Europe Size | US Size | International Size | Height (cm) | Chest (cm) | Waist (cm) | Hips (cm) |
|---|---|---|---|---|---|---|---|
| 98-104 | |||||||
| 104-110 | |||||||
| 110 | |||||||
| 110-116 | |||||||
| 116 | |||||||
| 116-122 | |||||||
| 122 | |||||||
| 122-128 | |||||||
| 128 | |||||||
| 128-134 | |||||||
| 134 | |||||||
| 134-140 | |||||||
| 134-146 | |||||||
| 140 | |||||||
| T140 | |||||||
| 140-146 | |||||||
| 146 | |||||||
| 146-152 | |||||||
| 152 | |||||||
| 158 | |||||||
| 164 | |||||||
| XXS | |||||||
| XS | |||||||
| S | |||||||
| M | |||||||
| L | |||||||
| XL | |||||||
| Universal | |||||||
| Baby | |||||||
| 28-36 (UA) | |||||||
| 38-52 (UA) | |||||||
| 28 (UA) | 110 | 5-6 | 5-6 | 110 | 56 | 52 | 62 |
| 30 (UA) | 116 | 5-6 | 5-6 | 116 | 60 | 54 | 66 |
| 32 (UA) | 128 | 7 | 7 | 128 | 64 | 56 | 70 |
| 34 (UA) | 134 | S | S | 134 | 68 | 58 | 74 |
| 36 (UA) | 146 | S/M | S/M | 146 | 72 | 60 | 78 |
| 38 (UA) | 32 | 0 | XXS | 152 | 76 | 62 | 82 |
| 40 (UA) | 34 | 2 | XS | 158 | 80 | 63 | 86 |
| 42 (UA) | 36 | 4 | S | 164 | 84 | 64 | 90 |
| 44 (UA) | 38 | 6 | S/M | 164 | 88 | 68 | 94 |
| 46 (UA) | 40 | 8 | M | 164 | 92 | 72 | 98 |
| 48 (UA) | 42 | 10 | M/L | 170 | 96 | 76 | 102 |
| 50 (UA) | 44 | 12 | L | 170 | 100 | 80 | 106 |
| 52 (UA) | 46 | 14 | L/XL | 170 | 104 | 84 | 110 |
| 54 (UA) | 48 | 16 | XL | 170 | 108 | 88 | 114 |
| 56 (UA) | 50 | 18 | XXL | 170 | 112 | 92 | 118 |
| - (UA) | |||||||
| XXS (Fit 1) (UA) | |||||||
| XS (Fit 1) (UA) | |||||||
| S (Fit 1) (UA) | |||||||
| M (Fit 1) (UA) | |||||||
| L (Fit 1) (UA) | |||||||
| XL (Fit 1) (UA) | |||||||
| XXL (Fit 1) (UA) | |||||||
| XXS (Fit 2) (UA) | |||||||
| XS (Fit 2) (UA) | |||||||
| S (Fit 2) (UA) | |||||||
| M (Fit 2) (UA) | |||||||
| L (Fit 2) (UA) | |||||||
| XL (Fit 2) (UA) | |||||||
| XXL (Fit 2) (UA) | |||||||
| 12 cm (UA) | |||||||
| 14 cm (UA) | |||||||
| 16 cm (UA) | |||||||
| 18 cm (UA) | |||||||
| 20 cm (UA) | |||||||
| 22 cm (UA) | |||||||
| 23 cm (UA) |
Products of the DRAGO brand are made after the order is placed. The production time is 2 working days for orders placed before 11:00, or 3 working days — after 11:00.
FD Company products are usually available in stock. If a particular item is temporarily out of stock, the production time is 3–5 business days, depending on the current production workload.
FD Company products are usually available in stock. If a particular item is temporarily out of stock, the production time is 3–5 business days, depending on the current production workload.
DW.DANCEWEAR products are made after an order is placed. The production time is 3–5 business days.
FD Company products are usually available in stock. If a particular item is temporarily out of stock, the production time is 3–5 business days, depending on the current production workload.
FD Company products are usually available in stock. If a particular item is temporarily out of stock, the production time is 3–5 business days, depending on the current production workload.
The product has been added to the cart! Make an order